PRE-TASK PLANNING WORKSHEET

Project: *
Foreman: *
Cell: *
Specific Location: *
Date: *
JHA:
Division : *
Trade / Crew Size
Sheet Metal:
Plumbers:
Fitters:
Controls:
Service:
Description of Work:
WALK WORK AREA   Do not start work before all hazards are mitigated
   
   
   
    If yes, coordinate with other trades
Will weather conditions affect the safe completion of this work?
 
If yes, what is being done to minimize or mitigate safety concerns?
Nearest Evacuation route:
Nearest Fire Extinguisher:
MATERIAL HANDLING  
Inspection performed and documented
* Documented model specific training required for forklift operation
Check with Safety dept. if training is required.
Foreman or supervisor notified of any failed items noted during inspection:
Manual material handling of spiral duct or sharp edged materials requires the use of cut resistant sleeves and gloves.
ELECTRIC POWER TOOLS  
Inspection Performed:
GFCI Available






Remove damaged extension cords from service.Do not attempt to repair.
PERSONAL FALL ARREST  
Explain Below
BARRICADES   
Control zones must be established if hazards exist to other trade workers or the public.
WORK AT HEIGHT   
Are documented training records available for each model of equipment 
SCAFFOLDS   
CRANE WORK   
 
 
All employees within the fly zone must have documented training in rigging and signaling
LO/TO  
Are documented training records available
HOTWORK   
Follow instructions on permit and all policies and procedures.
CONFINED SPACES   
Are documented training records available
Permit must be returned to safety dept. upon completion of work
PPE   
Standard PPE includes hard hat, safety glasses, gloves, safety toe boots
Please List
Additional Comments:

PRE-TASK PLANNING